Construction of the north-west bypass of Merano

SAN BENEDETTO - MERANO SCARL

Late 2023

Surface and in the tunnel structural monitoring

Construction of a tunnel into rock and alluvial materials.
Real time monitoring by means of: vibrometers, crack gauges, strain gauges, automatic piezometers, load cells. Inclinometric and integrity checks of the foundation piles.
During rock excavation, monitoring provides for the management and control of n°18 automatic vibrometers which allows dynamic control of vibrations during drilling and blasting operations - real-time communication of vibrations, law of propagation of vibrations, visualizations of the vibratory effects of each blasting by isovelocity-curves in the planimetry.

 

View project status